In Blue Prism, which aspect does the Resume stage primarily manage?

Prepare for the Blue Prism Certification Exam. Study with flashcards and multiple-choice questions, each question has hints and explanations. Boost your confidence and ace your exam!

The Resume stage in Blue Prism is primarily designed to manage the transition out of Recovery Mode. When a process encounters an exception, it can enter Recovery Mode, allowing the system to handle that exception properly. The Resume stage facilitates the continuation of the process after the exception has been addressed, ensuring that the workflow can move forward without disruption.

By managing the transition back to the normal flow of the process, the Resume stage plays a critical role in maintaining process integrity and accuracy. This is essential for effective exception handling, as it ensures that once an issue has been resolved, the process can carry on seamlessly.

In contrast, other aspects, such as logging exceptions, creating new exceptions at each stage, or removing exceptions entirely, do not align with the primary function of the Resume stage. These processes pertain to different stages of exception handling or logging, and do not capture the essential purpose of the Resume stage in aiding the recovery process.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy